What's involved in installing gas or propane to heat my pool or spa?
If this is an option you have decided on, your city's gas line / propane tank requirements
and your individual lot size will determine whether your gas line or propane tank can be
buried underground or must be above ground. If it can be buried, the trenches will be dug
and the pipe will be laid at the time of the plumbing of your new pool. This pipe will
have to be inspected by the city/county and the entire process takes 3-5 days. Do not be
alarmed if the actual hookup of your gas or propane does not happen until your pool has
been completed.
Having a gas line or propane tank installed can run concurrently with other construction
phases and will not necessarily hold up further construction.