What's involved in installing gas or propane to heat my pool or spa?

If this is an option you have decided on, your city's gas line / propane tank requirements and your individual lot size will determine whether your gas line or propane tank can be buried underground or must be above ground. If it can be buried, the trenches will be dug and the pipe will be laid at the time of the plumbing of your new pool. This pipe will have to be inspected by the city/county and the entire process takes 3-5 days. Do not be alarmed if the actual hookup of your gas or propane does not happen until your pool has been completed.

Gas
Having a gas line or propane tank installed can run concurrently with other construction phases and will not necessarily hold up further construction.



PLEASE KEEP CHILDREN AND PETS AWAY FROM THE POOL CONSTRUCTION AREA.

(559) 635-9637